How to Use the Workout App on Apple Watch

Jignesh Padhiyar·

Master the Apple Watch Workout app with this guide. Track any activity, customize stats, set alerts, and unlock advanced health and fitness features.

How to use the workout app on apple watch in watchos 9

iGeeksBlog is supported by its readers. When you buy through links on our site, we may earn an affiliate commission. This doesn't affect our editorial independence.

Key Takeaways:
  • What the Workout app does: Apple Watch’s Workout app tracks dozens of activities and syncs data with Health and Fitness apps for complete progress insights.
  • How to start and stop a workout: Open Workout, pick an activity, tap Play after the countdown, and swipe right when you’re ready to finish.
  • Ways to customize your workouts: You can set heart rate zones, create structured intervals, and enable pace alerts to match your training goals.
  • Extra tools for advanced athletes: GPS maps, swimming mode, cadence and form tracking, haptic alerts, and auto-pause cater to serious fitness routines.
  • How Multisport workouts work: You can combine running, cycling, and swimming in one session, with each activity tracked separately but saved as a single workout.

An Apple Watch isn’t just a sleek fashion accessory; it’s a powerful fitness tracker on your wrist. Whether you’re doing an intensive HIIT session or just a casual indoor walk, the Workout app on your Apple Watch transforms each activity into a detailed performance log. When used properly, the app provides accurate stats, personalized training insights, and even coaching-style feedback powered by AI.

This guide explains how the Workout app works, its customization options, advanced features, and tips to maximize your Apple Watch fitness tracking.

What Is the Workout App on Apple Watch?

The Workout app is Apple Watch’s built-in fitness tracker that helps you start, monitor, and analyze workouts while syncing data seamlessly with the Health and Fitness app on your paired iPhone. It supports a wide range of activities, including but not limited to:

  • Outdoor and indoor running
  • Walking and hiking
  • Cycling
  • Swimming (pool and open water)
  • High-intensity interval training (HIIT)
  • Yoga, Pilates, and Dance
  • Rowing and Elliptical
  • Strength training
  • Custom Workouts

Once recorded, your data integrates with the iPhone’s Health and Fitness apps, giving you an easy-to-read breakdown of progress, trends, and health insights over time.

How to Access and Start a Workout on Apple Watch

Getting started with the Workout app is simple:

  1. Open the Workout app on your Apple Watch.
  2. Scroll down to choose from the available pre-added workouts.
    Open workout app and choose added workout
  3. Alternatively, if you can’t find the workout you’re looking for, scroll down to the bottom and tap the Add Workout button to choose a workout that isn’t available by default.
    Add workout in workout app on Apple Watch
  4. Once selected, tap the Play (Start) button, and the workout will begin after a 3-second timer.
  5. To end the workout, simply swipe right and tap the End button.
    Manage workout by end and pause option

Customizing Your Workouts

Personalization is key to making the most of the Workout app. You can tailor metrics, set intervals, and add pace alerts.

Change Metrics

  1. If the default workout view doesn’t appeal to you, tap the Display Metric icon at the top left to change views and display metrics like pace, heart rate, or elevation.
  2. Select one of the available workout views.
  3. Alternatively, tap the Pen icon on a workout view to edit metrics in it.
    Tap the pen icon on workout view to edit metrics

The selected workout view will now appear during all your current and future workout sessions.

Create Custom Structured Intervals

  1. Open the Workout app and choose a workout.
  2. Tap the Timer icon at the top right corner.
  3. Tap Custom.
  4. Tap the + button.
    Open workout app select custom option
  5. Tap Add, then choose Work and Recovery Intervals.
    Tap add and choose work and recovery
  6. Set the Duration.
    Set duration and tap done button

Set Heart Rate Zones

  1. Open the Watch app on the paired iPhone.
  2. Scroll down on the My Watch tab and tap Workout.
  3. Locate and tap Heart Rate Zones.
  4. Choose Automatic or set the zones manually.

Add Pace Alerts

  1. Open the Workout app and select the workout you want to perform.
  2. Tap the Bell (Alerts) icon at the bottom right corner.
  3. Tap on Pace.
  4. Pick your target pace range.
    Set pace alert on workout app

Cycling Power Zones (Apple Watch Ultra / newer models)

  1. Open the Watch app on the paired iPhone and ensure you are on the My Watch tab.
  2. Scroll down and select the Workout app.
  3. Locate and tap Cycling Power.
  4. Now, choose Automatic or set the zones manually.
    Manage power zones for cycling workouts

Warmup & Cooldown Tracking

  1. Open the Workout app and select the workout you want to perform.
  2. Tap the Timer icon at the top right.
  3. Select Custom, and tap the + button on the subsequent screen.
    Select custom to add new custom workout
  4. Tap Warmup.
  5. Set the Distance and Time.
  6. Repeat the same for Cooldown tracking, and you are done.
    Select warmup and manage distance and time

Advanced Features for Serious Athletes

Even though competitors like Whoop bands are popular, Apple Watch has powerful pro-level training features:

  • Heart Rate Zones & Coaching Cues: Stay in your optimal zone.
  • GPS Mapping & Race Routes: Track outdoor runs and compete with past records.
  • Running Form Metrics: Stride length, ground contact time, vertical oscillation.
  • Haptic Alerts: Wrist taps for milestones.
  • Swimming Mode: Tracks strokes, laps, SWOLF score, activates Water Lock.
  • Auto-Pause: Stops tracking when you stop moving.

Tracking Multiple Activities (Multisport Workouts)

For triathlons or mixed workouts:

  1. Open the Workout app and scroll down to the Multisport workout and tap on it.
  2. Tap the Add button to add or remove an activity. You can add as many activities as you want.
    Tap add button to add multiple activities
  3. To remove an activity, swipe left on it, then tap the Delete icon.
  4. Drag and drop the activity tabs to rearrange their order.
  5. Finally, scroll down and tap Start Workout.
    Track multiple activities on workout app

Each activity is tracked separately but logged as one session.

Workout Reminders & Auto Detection

Apple Watch can auto-detect workouts and send reminders so you don’t miss tracking.

Here’s how you can enable Auto Detection and Reminder:

  1. Open the Watch app on the iPhone and make sure you are on the My Watch tab.
  2. Select the Workout app.
  3. Toggle on Start Workout, Resume Workout, and End Workout.
  4. Tap on Auto Pause, then toggle on Auto Pause in the subsequent menu.
  5. Toggle on the preferred workout types.
    Open Watch app and toggle on auto pause option

Viewing, Editing & Deleting Workout Data

As your Apple Watch is a companion device to your iPhone, all the tracked data is shared with the paired iPhone. Therefore, you can view your workout data on both the watch and the iPhone, but deleting data is only possible on the iPhone. Here’s how:

On Apple Watch

When you finish, you’ll see a summary on your watch. Moreover, if you performed the multisport activity, you can check the related summary in the Activity app as well.

  1. Open the Activity app and scroll down to the Today tab.
  2. Tap the Multisport tab, and all the related data will appear.
    Manage workout data on Apple Watch

On iPhone

  1. Open the Fitness app, scroll down on the summary screen and tap See All Categories.
  2. Select the workout type whose related data you want to view. We’ve selected Sessions.
  3. Here, you’ll see all your recent workout data. Select one.
    Select categories to see all recent workout data
  4. Next, tap Workout Details for detailed stats, maps, and trends for the related activity.
  5. To delete workout data, swipe left on it and tap Delete.
    Manage workout data on Watch app on iPhone

Tips for Getting the Most Out of the Workout App

While the Workout app excels at what it’s designed to do, knowing how to make the most of it helps you get better tracking and the insights you’re looking for.

  1. Set Clear Goals Before Starting: Decide whether you want to improve endurance, burn calories, or build strength. Having a clear goal allows the Workout app to provide more accurate tracking and insights.
  2. Enable Voice Feedback: Turn on audio cues so your Apple Watch can update you on distance, pace, and heart rate without needing to glance at your wrist mid-workout.
  3. Use Auto-Pause for Runs and Walks: If you often stop at traffic lights or take breaks during workouts, enable Auto-Pause in Settings so the Watch pauses tracking automatically.
  4. Combine Workouts with the ‘Add’ Feature: If your routine involves multiple activities (like running followed by cycling), you can add workouts back-to-back for a complete session log.
  5. Review Trends in the Fitness App: After your workout, check the Fitness app on your iPhone to view long-term progress, trends, and detailed charts that aren’t visible on the Watch.
  6. Sync with Third-Party Apps: Connect apps like Strava, Nike Run Club, or MyFitnessPal with Health for additional insights and challenges.
  7. Optimize Battery Usage: If you’re going for a long run or hike, enable Power Saving Mode to extend battery life while still tracking essential metrics.
  8. Customize Display Metrics: Rearrange workout screens to show the most important data for you such as pace or heart rate zone so you don’t have to scroll through defaults.
  9. Celebrate and Share Achievements: Close your activity rings, earn badges, and share your workout summaries with friends for motivation and accountability.

Safety & Wellness Features During Workouts

Apple Watch isn’t just about fitness—it safeguards your health too:

Indoor vs. Outdoor Tracking Differences

FeatureWorkouts (GPS)Indoor Workouts (No GPS)
Distance TrackingUses GPS for high accuracy.Uses accelerometer and stride calibration.
Speed/PaceCalculated from GPS and motion sensors.Estimated from wrist movement and cadence.
ElevationMeasured via barometric altimeter.Not available.
Route MappingFull GPS route available in Fitness app.Not recorded.
CalibrationImproves with outdoor runsRelies on outdoor calibration

Troubleshooting Common Workout App Issues

ProblemPossible CauseSolution
GPS not accurateWeak signal / not calibratedDo a 20-min outdoor run with iPhone
Heart rate not recordingLoose fit / dirty sensorsWear snugly, clean sensors, restart
Workout didn’t saveSync glitchCheck iCloud sync, restart, force-quit app
Battery drains too quicklyAlways-On Display or full tracking enabled.Use Low Power Mode, turn off Always-On Display during workouts.
Auto detection not workingFeature disabled in settings.Go to Watch app > Workout > Toggle on Start/End/Resume Reminders..

Your Apple Watch, Your Personal Trainer

That’s everything you need to know about the Workout app on Apple Watch. From casual walks to triathlons, it’s designed to support every fitness journey. Whether you’re just closing rings or training competitively, mastering these features helps you perform better and build healthier habits.

Have you tried the Workout app yet? Share your favorite feature or tip in the comments below!

Read more:

Written by

Jignesh Padhiyar

Jignesh Padhiyar is the co-founder of iGeeksBlog.com, who has a keen eye for news, rumors, and all the unusual stuff around Apple products. During his tight schedule, Jignesh finds some moments of respite to share side-splitting content on social media.

View all posts →

More from Apple Watch